DCSC Construction Update
Update #7
Important Update from DCHS
We are within two weeks of Warrior Way closing for the next 18 months. We wanted to share with you the attached maps (see below) that show the traffic pattern at the high school for arrival and dismissal beginning on April 1, 2024.
What the colors on the maps mean:
- Orange - the bus route
- Green - the student route
- Blue - the parent/guardian route
- Red - fencing
- Yellow - temporary access to the loading dock and door 9 for special education students.
South Front Office
It is always so cool when framing turns into real, fully shaped spaces. That's exactly what we are seeing in the front office at South Elementary! The drywall and tiling work continues, and the results are incredible so far.
South Back Classroom Addition
Last time we checked in, the back of the building was beginning to take shape internally, which means that the rooms were being formed! Drywall, framing, and duct work continues in this area, and the large open spaces are now being dividing into individual classrooms.
High School Phasing
Below is our tentative phasing timeline for DCHS. Please note that this is subject to change.
Additional Updates for the Future
Change is on its way to DCHS! Below are a series of photos that showcase our plans for this building. We plan to break ground at the school this spring, with a lot of work happening over the summer when students are not in school.
Front Entrance
Front Lobby
Cafeteria
Commons
Recent Videos
Update for the Superintendent - 2nd Grade Transition to South
Dr. Shafer recently provided an update to the community about the 2nd grade transition to South! Watch the below video to hear all of the information available at this time.
South Update with Mrs. Hollingsworth
Follow us to learn more!
Email: aengland@danville.k12.in.us
Website: https://www.danville.k12.in.us/domain/221
Phone: 317-745-2212
Facebook: https://www.facebook.com/DCSCWarriors
Twitter: @DCSCWarriors